Welcome, Guest. Please Login or Register
Decware Audio Forums
03/28/24 at 14:55:16 




Pages: 1
Send Topic Print
MKII construction photos (Read 8252 times)
RFZ_Quest
Ex Member



MKII construction photos
11/26/05 at 18:12:20
 
I am in the dry fit and assembly stage of my HDT MKII cabinets. Here are some pics of the process. I will continue to post as the construction proceeds.

Paul



This is a dry fitting without any clamps to show internal view of port plate with custom dual flared ports in place prior to cutting out transmission line area in port plate.
Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #1 - 11/26/05 at 18:15:15
 
This view shows bottom enclosed area prior to removing transmission line area in port plate.

Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #2 - 11/26/05 at 18:17:39
 
Internal view from top with transmission line cut out.

Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #3 - 11/26/05 at 18:20:12
 
open view showing both sides of port plate.

Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #4 - 11/26/05 at 18:22:29
 
Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #5 - 11/26/05 at 18:24:57
 
View of flared exits into bottom of enclosure.

Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #6 - 11/26/05 at 18:27:59
 
Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #7 - 11/26/05 at 18:30:10
 
Back to top
 
 
  IP Logged
gexter
Ex Member



Re: MKII construction photos
Reply #8 - 11/26/05 at 19:30:28
 
nice, really nice
Back to top
 
 
  IP Logged
Yoda
Ex Member



Re: MKII construction photos
Reply #9 - 12/01/05 at 16:31:19
 
Very nice indeed!  Been thinking about the MK II drivers for my HDT cabs-what is Decware selling them for?  

Matt
Back to top
 
 
  IP Logged
Yoda
Ex Member



Re: MKII construction photos
Reply #10 - 01/05/06 at 18:22:12
 
How are those Mk II's coming along... and has anyone heard them WRT the original HDT?

Matt
Back to top
 
 
  IP Logged
RFZ_Quest
Ex Member



Re: MKII construction photos
Reply #11 - 01/14/06 at 03:09:58
 
Yoda and everyone,

Sorry about the long delay in the posting sequences. I have delayed the building sequence due to other priorities but will get back to this post when ready. The cabinets still require assembly, however, all parts are cut including custom hardwood ribbon enclosures made from bloodwood of which required extensive routing and shaping to evolve into current form. Photos of these will be posted eventually. The cabinets are done in Cherry with African Padouk edge trim all contoured for smooth blending.


Will be back in the near future with additional assembly photos.

Paul
Back to top
 
 
  IP Logged
Yoda
Ex Member



Re: MKII construction photos
Reply #12 - 01/16/06 at 18:02:17
 
My MK II drivers arrive tomorrow...
Back to top
 
 
  IP Logged
Pages: 1
Send Topic Print